More than 1000km of power
transmission lines up to 500kV
Abo Zaable- El-Sokhna 500kV OHTL,Egypt
Mostakbal city SS – Badr City SS, Egypt
Al Fayoum – Banisuef – Elmenya, Egypt
Namanve South Industrial Park, Uganda
Luzira Industrial Park , Uganda
Mukuno Industrial Park, Uganda
Iganga Industrial Park, Uganda
Lira- Gulu- Agago, Uganda
Mirama- Kikagati- Nsongezi, Uganda
Lira- Gulu- Agago
Uganda
132 kV Overhead transmission line to connect Lira- Gulu- Agago substations in Uganda
Shaker scope includes detailed design, tender document, bidding, RAP implementation and construction supervision.
Abo Zaable/El-Sokhna 500kV OHTL,10km
Egypt
Relocation of Abo Zaabal/ El Sokhna over head transmission line to avoid the new Al Mostakbal city development district.
SHAKER scope includes topographical route survey, line profile, tower selection and spotting, soil investigation, towers design, foundation design, calculations of stringing tables, construction supervision.
400 kV Over Head Transmission Line,
Tanzania
Consultancy services for supervision and management on construction of 400kv transmission line for power evacuation from Julius Nyerere hydropower project to Chalinze-Kinyerezi, Chalinze-Dodoma and Associated Substations at Kinyerezi and Chalinze (lot 1: Julius Nyerere to Chalinze and Chalinze substation)
Shaker scope includes the provision of consultancy services for supervision and management on construction of 400kv transmission line and substations